top of page

Large Scale Energy Efficient Lighting Replacement at
Multiple Gov. Schools
於各政府學校大規模
更換節能燈具

Over 10,000 

Units of LED Luminaire Replaced 

Image by Arifin Salleh

Rhenish Church Pang Hok-Ko Memorial College

禮賢會彭學高紀念中學

Lok Sin Tong Wong Chung Ming Secondary School

樂善堂王仲銘中學

Rosaryhill School

lam-tai-fai-college.jpg

Lam Tai Fai College

林大輝中學

420px-Notre_Dame_College_after_repaint_edited.jpg

Notre Dame College

獻主會聖母院書院

2022年2月-聖文德天主教小學A_edited.jpg

St. Bonaventure Catholic Primary School

聖文德天主教小學

dan-schiumarini-dcL8ESbsGis-unsplash copy.jpg

Technical Drawing & Documentation Support/Consultancy Service

24hrs

Professional Online Technical Support

100%

Satisfaction Rated by Clients

We provide M&E/construction related documentation supports, including but not limited to the followings:

  1. Method Statement

  2. Material Submission

  3. Shop Drawing 

  4. As-fitted Drawing

  5. M&V Report

  6. Tendering Document:

  • Bill of Quantity

  • Technical Proposal

bottom of page